T : +(603) 7806 3550   |   F : +(603) 7806 5586
everworks it expertise

Cloud Computing

Offering you the best

everworks services

Data Backup

Data backup solution

everworks infrastructure

This is default featured slide 3 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

everworks cloudster

This is default featured slide 4 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

everworks databackup

This is default featured slide 5 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

Wednesday, 7 May 2014

EVERWORKS Data Center Migration - Quick Checklist


Here is a quick checklist from an EVERWORKS specialist, Wong. He shares with us just what is needed in a brief quick session, if more help is needed contact cvs@everworks.com.

Important Note: EVERWORKS offers clients a 1 week free trial for IDC services (this is a benefit for clients to test out our network routes and connectivity for their applications and hardware). After ensuring that the tests have been carried out accordingly, then will EVERWORKS only prepare a rack space, implement network cabling, and install IP.

Data Center Migration, is quite a mouthful and can be rather intimidating, but here is a quick checklist that we use for new or even existing customers:

1. Schedule a meeting


  • There will be a scheduled appointment arranged with you (our customer) to define what are the your requirements, the roles and needed responsibilities.
  • Next up is to visit our Data Center (an arranged tour facility), mainly for you to have a look and feel to what you are investing in; power, cooling, security, protection, floor space, technical support, etc.
  • A technical team will be built and responsibilities assigned for the particular Migration Project.
  • Draw back and conclude, define, and ensure that all areas of required expertise are sufficiently covered.

2. Data Center Site is provided for you to test critical applications and server hardware


Identifiers:
  • Rack space placement is prepared, network & internet connectivity is tested, network cabling is carried out, power management, and installation of IP addresses.
  • Ensure that your hardware is fully operational.
  • Ensure that your critical applications are running without any issues. (If there are any issues, what solution is required)
  • Ensure that your networking equipment is fully operational.

Actions:
  • Provide solutions for any problems identified thus far.
  • Constant communication to ensure that everything is accurately understood between all parties involved.

3. Time-line is prepared and move date determined


  • Backups of critical data is performed and verified, before the Migration Project begins.
  • Plans for business interruption is put into place. (Time period of server temporary shutdown)
  • Moving of all hardware.
  • Transportation of hardware.

4. Finalizing Migration


Once the Migration has been completed, everything is checked and an inventory is defined to ensure that everything is in place. 

Your migration should be successful and without any problems by the end of this exercise.

---

If you any further inquiries please contact EVERWORKS support at +603-78063550 or cvs@everworks.com

Wednesday, 2 April 2014

Data Center Migration {Plan for Success}


I felt for people who need a solution for something *more than just data transfer EVERWORKS does provide an industry leading Network Migration solution. EVERWORKS Network Migration Solution is more than mere copying and pasting data, it is a solution that ensures a full migration service. According to our specialist Wong and Jimmy here is what they would love to share with you!

Introduction


Data Center migration refers to moving data from one device to another. Simple as it may sound it proves to be a challenging task, though it is the most routine of tasks. Critical drivers that move data from one storage device to another on a regular basis are workload balancing, technology upgrade, server and storage consolidation, data center relocation, data classification, and mergers/acquisitions.

What drives the need for a migration?


There are many reasons that could lead to the need for a data center migration. Amongst some of the reasons are:

  1. Growth; sudden need that exceeds current capacity
  2. Performance; ability for the hosting provider to provide the solution you critically need
  3. Real estate changes
  4. Local data center economics
  5. Density requirements
  6. Staffing considerations
  7. Green initiatives
  8. etc.

How does migration strain you?


As with most things (migration included), there is prevalent restrictions that business, technical, and operational requirements impose on the migration process. There is a great need for resources (staff, bandwidth, CPU cycles) and inevitable risks (application downtime, performance impact, technical incompatibilities, and data corruption/loss).

{Plan for Success}


Data Center Migration is tough work, the margin for error is near zero and the timeline is almost always short, making migration projects very high risk and a large stress basket. To minimize risk (anticipate and prevent as much risk as possible) the migration project must be organized, planned, and flawlessly executed.

Creating a Migration Plan


A migration plan is a blueprint to what you want to deliver in the end. This should be your guide and it specifies customer expectations, defining project deliverables and identifying migration methodologies that can be used. There are four (4) major parts that make a migration plan:

  1. Business and operational requirements
  2. Data to be migrated with all associated attributes
  3. Available Migration Tools
  4. Storage and application best practices

Migration Project Phases


1. Gathering requirements

Business objectives, resources required, and specific details of the project should be organized and documented. The documentation serves as a valuable information resource to guide and develop the project plan, provide business communication, and backup material for budgetary justification.

2. Developing a plan

Migration Projects require advanced planning and consideration of every aspect of the move process. Data needs to be gathered, proper documentation is required, problem areas needs to be identified with the right contingencies developed, task completion checklists need to be compiled during the migration phase and end-to-end test plans need to be developed.

3. Implementation

Migration typically begins with the basic communication to the organization and pre-migration prep-work. An effective implementation includes; a smooth migration that is on schedule, a trial run has been scheduled to unearth any potential issues, efficient communication with the move team and resources backed up to ensure full resource availability, precisely following the plan to avoid missed steps and unwanted sequence of errors, documentation of every task that is completed.

4. Validation

The final phase of the migration project is as critical as the beginning and the middle. Finishing it right. Make sure that all tasks that have been completed and verified that it has been completed. Adequate recovery and contingency procedures have been documented and a smooth communication between all affected parties have been put into place.

Conclusion


The ultimate goal of migration is to move data, but it isn't just data. It requires a lot of prior planning prior to the movement to ensure a successful migration. There are a ton of cases that caused more catastrophe than it should have if, having in mind, the proper front-planning was done. Irrespective of the complexity, pre-planning reduces the strain and duration of the migration process by a fair amount. It also reduces business impact and risk.

- Downtime, performance degradation, data corruption/loss, etc. - are among the few problems that occur when performing migration. Consider consulting a pro to have your migration done, it could save a lot of headache and sleepless nights. EVERWORKS provides no-nonsense data migration. Eliminate your worries. Find out more about it here.

---


  1. What are your experiences with migration? 
  2. Were there any complexities that was beyond the pre-plans?